Are all chart options time based?
Issue #81
open
I have a need to use the x axis for assignee and the y axis for something like estimated time or story points in the form of a bar graph to see workload. Can the x axis be used this way?
Comments (4)
-
repo owner -
repo owner - changed status to resolved
-
Account Deleted reporter Is that a limitation, or can this be considered a feature request?
-
Account Deleted reporter - changed status to open
- Log in to comment
Ah, sorry. Yes it’s all time based