Allow transition if linked issue has a specific status

Issue #707 resolved
Steffen created an issue

Hello Fidel!

I have a test and 2 linked requirements, both have a different workflow. I want to forbid the next transition as long as the 2 linked requirements have a specific status.

I tried with "Validation on linked issues" but it seems that the transition is blocked whenever a requirement is linked.

I used:

  • Issue link types: tests (because TEST tests the REQ)
  • Issue types for linked issues: Requirement (the linked issue type)
  • Statuses for linked issues: Ready for Implementation (thats the wanted status of Requirement)

Thanks for your help!

Comments (8)

  1. Fidel Castro Armario repo owner

    Then I think that you have other issue types different from Requirement also linked with issue link type tests.

    Try checking "Unselected issue link types are allowed" and "Unselected issue types are allowed".

  2. Log in to comment