Problem with Post Function - Change Status of Linked Issue > Break Issue Link
Hello -
I am having problems with a Post Function in my workflow. I have successfully linked 2 different issue types via Post Functions.
At this point in my workflow (see screenshot), if I decide to choose transition "Move Back to Bench," I want the linked Issue to move from "Vacant," back to "Open." As of now the linked issued remains at Vacant, and the Issue Link does not break.
I currently have the same kind of Post Function successfully configured in a later stage of my workflow. I am not sure why this configuration is not working.
Any help you may have would me much appreciated. Thanks in advance.
Comments (3)
-
repo owner -
reporter Hi Fidel -
That was the problem. A transition did not exist. Silly mistake by me. Thanks for the help. Also, your JIRA Workflow Tool box add-on has been great!
-
repo owner - changed status to resolved
You are welcome :)
- Log in to comment
There must be a transition from Vacant to Open status in "Contract Positions" workflow, and conditions and validations should be satisfied.
If the transition exists, please, attach screenshots of conditions, validations and post-functions tabs.