Problem with Post Function - Change Status of Linked Issue > Break Issue Link

Issue #768 resolved
MAG-II created an issue

Hello -

I am having problems with a Post Function in my workflow. I have successfully linked 2 different issue types via Post Functions.

At this point in my workflow (see screenshot), if I decide to choose transition "Move Back to Bench," I want the linked Issue to move from "Vacant," back to "Open." As of now the linked issued remains at Vacant, and the Issue Link does not break.

I currently have the same kind of Post Function successfully configured in a later stage of my workflow. I am not sure why this configuration is not working.

Any help you may have would me much appreciated. Thanks in advance.

Back to Bench - 1 .png

Comments (3)

  1. Fidel Castro Armario repo owner

    There must be a transition from Vacant to Open status in "Contract Positions" workflow, and conditions and validations should be satisfied.

    If the transition exists, please, attach screenshots of conditions, validations and post-functions tabs.

  2. MAG-II reporter

    Hi Fidel -

    That was the problem. A transition did not exist. Silly mistake by me. Thanks for the help. Also, your JIRA Workflow Tool box add-on has been great!

  3. Log in to comment