Commits

Author Commit Message Labels Comments Date
g...@grbmbp.local
More brush cleanup
g...@grbmbp.local
More cleanup
g...@grbmbp.local
More brush cleanup
g...@grbmbp.local
Cleaned up some texturing
g...@grbmbp.local
Made the pipe hallway more uniform
g...@grbmbp.local
Added more clipping
g...@grbmbp.local
Converted the first pipe room into a wide hallway
g...@grbmbp.local
Added more clipping to the new pipe room
g...@grbmbp.local
Added a detail light to the pipes in the new room
g...@grbmbp.local
Added some missing clip brushes
g...@grbmbp.local
Converted the rest of the walkway sections to the new style
g...@grbmbp.local
Converted one of the walkway sections to a new style
g...@grbmbp.local
Minor brush cleanup
g...@grbmbp.local
Fixed the ceiling for the new walkway
g...@grbmbp.local
Added more detail to the new walkway (again)
g...@grbmbp.local
Added more detail to the new walkway
g...@grbmbp.local
Added a walkway to one of the new rooms
g...@grbmbp.local
More detail in the newest room
g...@grbmbp.local
Added a bunch of pipes to the second new room
g...@grbmbp.local
Messing with some new rooms
g...@grbmbp.local
Made lots of brushes detail
g...@grbmbp.local
Lots of misc changes
g...@grbmbp.local
Scaled light up
g...@grbmbp.local
Added a big vent with pipes in the alien base
g...@grbmbp.local
Caulked some invisible surfaces and removed a bit of unneeded geometry
g...@grbmbp.local
Removed dolly in water room
g...@grbmbp.local
Added more supports to the cage in alien base; made some misc brushes detail
g...@grbmbp.local
Added a ladder to the platform in the water room
g...@grbmbp.local
Added a platform to the water room (currently unreachable)
g...@grbmbp.local
Added some more pipe and hose detail
  1. Prev
  2. Next