ApproxBetweenness::ApproxBetweenness wrong Formula

Issue #907 invalid
Matheus Araujo created an issue

In order to the Article you based this Algorithm.

The line 52:r = ceil((c / (epsilon * epsilon)) * (floor(log2(vd - 2)) + 1 - log(delta))); Should be: r = ceil((c / (epsilon * epsilon)) * (floor(log2(vd - 2)) + 1 + log(delta)));

The last sign is wrong.

Comments (5)

  1. Log in to comment