controller / status / MVP1_Iteration_Retrospectives

MVP1 Analysis

Project Analysis

These sections can list Progress Analysis against the Release and/or Milestone

Iteration Analysis

These sections can list the default Retrospective feedback and/or analysis on what the iteration delivered

S17.01

Key Priorities ..

  1. Transition from Elaboration / Risk mitigation to UCDD (Use Case Driven Development).

Analysis ..

S16.52

Analysis

  1. Short sprint, several people unavailable, so slower progress.
  2. Only ~2.5 points delivered.