Commits

Author Commit Message Labels Comments Date
osimons
[svn r10617] EstimationToolsPlugin: Milestone names with '(' or ')' in them display no data. Need to unquote parenthesis for query arguments. Closes #8299.
osimons
[svn r10557] EstimationToolsPlugin: Support `#` in field values for queries. Closes #9070.
osimons
[svn r10082] EstimationToolsPlugin: Don't use milestone 'due' date if it falls in the past, as data between 'due' and 'today' wont then be charted.
osimons
[svn r10048] EstimationToolsPlugin: Slight rework of server-side charts, switching to using `POST` requests to Google internally. References #5555.
osimons
[svn r9947] EstimationToolsPlugin: Fix for burndown chart line disappearing with `weekends=False` set.
osimons
[svn r9946] EstimationToolsPlugin: Fix 2 tests that broke when run on weekends... :-)
osimons
[svn r9930] EstimationToolsPlugin: Add dummy req.tz to support latest Trac 0.12 for running tests.
osimons
[svn r9694] EstimationToolsPlugin: Switch from pre-0.11 `render_macro()` call to `expand_macro()` call for Trac 0.11++
osimons
[svn r9029] EstimationToolsPlugin: Fix issue with Y-axis scaling when 'expected' value was higher than any max value for hours. Tests included. Closes #7003.
osimons
[svn r8896] EstimationToolsPlugin: Some 0.11 test breakage now fixed. All tests pass with both 0.11+ and 0.12+.
osimons
[svn r8886] EstimationToolsPlugin: Added 4 new tests as followup to [8758].
osimons
[svn r8884] EstimationToolsPlugin: Fixed 4 tests broken by [8758]:
osimons
[svn r8875] EstimationToolsPlugin: Wired up the tests in a suite that can now be run with `PYTHONPATH=. python setup.py test`.
osimons
[svn r8758] EstimationToolsPlugin: Quite a big batch of fixes and tweaks...
hoessler
[svn r8296] applied patch by bjorn@wololo.org and osimons to support trac 0.12. Fixes #7355.
hoessler
[svn r5360] Applied patch by Jason Winnebeck to enable HoursInPlaceEditor functionality in reports. This closes #4549
hoessler
[svn r5359] fixed doc
hoessler
[svn r5358] Integrated changes as proposed by Mark Seuffert in #4073. This fixes #4073, and additionally adds gridlines and expected progress to the burndown chart. Also, the bottom label is more compact now.
hoessler
[svn r5265] The lines shouldn't be transparent, but the default background. Fixes #4624.
hoessler
[svn r5160] Applied patch by Balint Kis that makes chart background transparent, and allows to change colors inside burndown chart. Additionally, closed tickets are ignored now in the workload chart.
hoessler
[svn r4893] Include max=0 in ticket query to really get all tickets. Fixes #4174
hoessler
[svn r4733] refactored "closedstated" into configuration option
hoessler
[svn r4703] Applied patch by Martin Aspeli so that tickets that are closed are treated as having an estimate of 0 in the burndown chart. The patch also includes some code clean up.
hoessler
[svn r4489] Implemented check for time frames <= 0 days. This should fix #3897.
hoessler
[svn r4450] fixed issue with empty chart if no milestone was given
hoessler
[svn r4448] Implemented flexible selection of tickets using the [http://trac.edgewall.org/wiki/TracQuery#QueryLanguage mini query language].
hoessler
[svn r4361] port to trac 0.11
hoessler
[svn r4332] Initial commit
hoessler
[svn r4331] Share project "EstimationTools-0.10" into "http://trac-hacks.org/svn/estimationtoolsplugin";