Details
-
Bug
-
Resolution: Fixed
-
Medium
Description
Currently within a pull request's Activity log, changesets links send the user to the target repository (where the changesets would be merged if the request was accepted).
However, until the request is actually merged in, those changesets don't exist (hence generating a 404); although the 404 page is nice, that's of no use. The changeset links in the activity tab of a pull request should send the user to the originating repository, like it is done is the Commits view, at least until the request is actually merged.