[TIME-167] Doesn't work in JIRA 4.4
This plugin stopped working completely in a 4.3 system that I upgraded to 4.4. It just gets stuck on the waiting indicator.
I've attached an image to show what I am seeing.
I've tried removing the gadget and adding it back, and that has no effect.
I have four timesheet gadgets on that dashboard and nothing else.
By acambre/Aren Cambre on Fri, 5 Aug 2011 09:52:41 -0700
Comments (5)
-
reporter -
reporter I already am using 2.2. I am using jira-timesheet-plugin-2.2.jar, which I downloaded on 7-23-11.
By acambre on Fri, 5 Aug 2011 12:37:52 -0700
-
reporter Aren, please redownload it, I've just fixed the problem today.
By azhdanov on Fri, 5 Aug 2011 14:14:56 -0700
-
reporter Thanks. That worked.
By acambre on Fri, 5 Aug 2011 14:41:59 -0700
-
reporter Great, enjoy it, and if possible consider of making a donation at http://sites.google.com/site/azhdanov/donate
By azhdanov on Fri, 5 Aug 2011 15:47:31 -0700
- Log in to comment
Please check issue
#166"[TIME-166] All timesheet gadgets hang indefinitely in Jira 4.4", I've just fixed it today, and you need 2.2 plugin. Thank you.By azhdanov on Fri, 5 Aug 2011 12:34:26 -0700