Time sheet report export wrong date to excel
Given that I log my work between 00:00 Am and 00:59 Norwegian time (UTC +1 ) and the time sheet report show correct date for the logged work. When I export the report to excel I expect to get the same date. But then the date has swirched to the date before. An example: I log work at March 6 at 0:35 (UTC +1) In the excel report the date is March 5. March 6 0:35 (UTC +1 ) = March 5 23:35 (UTC)
Comments (9)
-
-
-
assigned issue to
-
assigned issue to
-
Account Deleted Confirm that my version is 2.7.9
-
And does your JIRA and user have the same timezone as you, i.e. GMT+1 Oslo?
-
Account Deleted Let me test more. I upgraded to 2.7.9 yesterday . The bug might be in the previous version.
-
Account Deleted I think I deteched the bug in an excel report produced in the previous version after I had upgraded to 2.7.9. I am not able to reproduce in now.
-
Account Deleted - changed status to resolved
-
Cool, thank you for cooperation.
-
- removed version
Removing version: 2.7 (automated comment)
- Log in to comment
Hi Christian,
Could you confirm it reproduces for you on latest 2.7.9 version? It does not for me :-/
Thank you.