Wrong sum
I have made selection and have calculated the sum on Original Estimate 35.4, but having summarized all tasks manually - have received 28.4. Then I have opened all these tasks in Issue Navigator where the sum on this field also was 28.4. I can't understand why TimeSheet Report is shown by the sum 35.4, I think there can be a bug and it is very critical for me.
Comments (7)
-
-
reporter Hi,
this is url path with parametres.
ConfigureReport.jspa?startDate=30+January+2017&endDate=5+February+2017&targetUser=Denis&targetGroup=&excludeTargetGroup=&projectRoleId=&projectid=&filterid=11505&priority=&weekends=true&showDetails=true&sum=day&showEmptyRows=true&groupByField=&moreFields=issuetype&moreFields=timeoriginalestimate&moreFields=status&selectedProjectId=10109&reportKey=jira-timesheet-plugin%3Areport&Next=Next
-
- changed status to resolved
fix issue
#1052: sum subTasks time fields if reprot is with Sum Sub-Tasks only→ <<cset 2577d7524851>>
-
Hi Alik,
It appears for time fields like Original Estimate total is calculated summing up sub-tasks, so if report is built with no Sum SubTaks, then sub-tasks are added twice. As you might see I've fixed it for future update, and as workaround you may try to turn on Sum-Subtasks report option for now.
Thank you.
Additionally it appears that sub-tasks are It appears that time fields are summed including sub-tasks, even though you don't have Sum Sub-Tasks option turned on.
-
reporter Thanks for the quick fix
-
-
reporter Hi Andriy,
Thank you
- Log in to comment
Hi Alik,
Could you please clarify report configuration parameters you're using? You may copy paste url for simplicity.
Thank you.