Estimated finish time just increases by the second for Basic Sequencer

Issue #1220 duplicate
Kevin Jackson created an issue

[ Y ] Is the issue reproducible?
[ Y ] Are all prerequisites that are mentioned inside the manual met?

Which Version are you running? 2.1 HF1 RC006

Description

Active sequence details shows an Estimated finish time.
This time just seems like a clock set at some point in the future - but it increases, just like a clock set to the wrong time.

Steps to Reproduce

  • Create a basic sequence
  • Press Go/Start
  • On Image screen, sequence window, observe Estimated finish time increasing as if it’s a clock set to the wrong time.

Expected behaviour

And estimate should be time should be a fixed value based on somethimng like: time now + (n-subs x sub-length) + (n-subs x time take to download sub). The latter value could be estimated as “10 seconds” to avoid complexity, and it would still be more accurate.

Actual behaviour

Estimated time is increasing by the second.

Comments (2)

  1. Kevin Jackson reporter

    Additional detail - observing this for a few subs and it does appear to reset. Perhaps the increasing count during an exposure is what should be avoided, i.e. just refresh/update the time after a sub has completed.

  2. Log in to comment